What to Prepare Before You Receive the Keys to Your Home in Spain

One question I like to settle before handover is who can open the door for a delivery on a Tuesday morning. It is easy to overlook when you are choosing finishes from another country. Yet the answer can determine whether a mattress makes it upstairs or goes back on the van.

Put four things in your handover pack

  1. The latest drawings. Keep the dimensioned floor plan, electrical layout and developer specification together. Date each version so everyone is measuring from the same drawing.
  2. An access contact. Agree who can receive keys, attend appointments and sign for deliveries within the scope you have arranged. Ask the building manager about delivery hours, lift reservations and parking for unloading.
  3. A room-by-room inventory. Mark what is supplied, what you are bringing and what still needs ordering. Count small items too, especially bedside lights, curtain tracks, towels and the first set of bedding.
  4. Two dates. Record the expected handover and the night you want to sleep there. If handover moves, decide which bookings need changing and who will tell each supplier.

Use the first visit to settle measurements

Photograph each room from its doorway and each window straight on. Check opening directions, finished ceiling heights, sockets and obstructions. At the entrance, check the lift door and the tightest turn on the route upstairs. Keep these notes with the room name so a supplier can tell which measurements apply to which opening.

I would hold a made-to-measure curtain or wall panel until someone has checked the finished dimensions. You can still choose its fabric or finish and ask about lead times beforehand. That keeps the design moving while protecting the fit.

If you are buying off-plan, share the developer information you already have and the rooms you want ready first. See our approach to new-build interiors.